|
Film Expert |
Joined: Thu Jul 26, 2018 9:48 am Posts: 1 Location: Georgia, USA
|
I just bought a Eumig 610D projector and want to replace the rubber shutter belt. It looks like the complete motor assy needs to be removed to get the belt installed on the pulleys. I would like to get the service manual before I attempt to take the unit apart, as I assume it would show what is involved to replace the belt. My projector is in excellent condition and I am in the process of transferring my 8mm family films to solid state memory. I have seen on this forum that a service manual is available from some of the members for this unit. I need help getting one. The belt in my unit looks like the original belt and should be replaced ASAP. I have the new belt and just need a little direction on the installation procedure. Any help would be appreciated.
|
|